Skip to main content
connic

Your team asks in the chat.
Your documents answer.

Employees ask in Slack, Telegram, by email or in your own portal. Answers come from your manuals, procedures and handover notes and name the page. When the documents don't cover a question, the assistant says so instead of guessing.

#maintenance
chat.example.com/ferrow/maintenance
maintenance
TM
Tobias Marx06:12

@Plant assistant what torque for the jaw screws on the TL-400 chuck after a jaw change?

1 reply in thread
Plant assistantBot06:12

Tighten the four M12 jaw screws crosswise in two passes: first to 60 Nm, then to 110 Nm. Check the jaw run-out afterwards, maximum 0.02 mm.

Sources:TL-400 service manual, section 7.3, p. 86

Message #maintenance

Answers where the question comes up.

One plant, four places where people ask. Every answer names the document it comes from.

A technician sends a photo of the alarm on the press panel in Telegram. The assistant replies with the cause, the fix and the manual page.

9:41
Plant assistant
bot
PRESS PR-630 · LINE 2
E-214
HYDR. PRESSURE LOW

Press 3 stopped, what does this mean?

E-214 means the hydraulic pressure was below 180 bar at cycle start. Check the oil level at the sight glass on the power unit, then the pressure filter indicator. If it shows red, replace filter element 42-118 before you restart.

PR-630 operating manual, error list, p. 142

PR-630 manual.pdf · p. 142
PR-630 press · Operating manual142
12.2 Error list
  1. E-212 Lubrication pressure low. Check the central lubrication tank and its filter.
  2. E-213 Ram position sensor fault. Check the cable at the sensor plug.
  3. E-214 Hydraulic pressure below 180 bar at cycle start. Check the oil level at the sight glass, then the pressure filter indicator. Red: replace element 42-118.
  4. E-215 Hydraulic oil above 60 °C. Check the cooler fan and let the unit cool down.

A shift lead signs in to the plant portal and asks what happened on press 3. The answer sums up the last three handover notes, each with date and shift.

Ask · Plant portal
portal.ferrow.example.com/ask
FerrowAskMachinesShiftsAnna Krause · Shift lead, Plant 2AK
What happened on press 3 in the last shifts?

Press 3 had one longer die change and two hydraulic stops. It has run without stops since this morning.

Night, Nov 12
Die change took 40 minutes longer: guide pin on the upper die is worn. Replacement ordered, fits on Friday.
Late, Nov 12
Stopped twice with E-214. Oil topped up by 8 litres, running since 21:40.
Early, Nov 13
No stops. Upper die guide pin checked at 10:00, still within limits.
Handover 2026-11-12 nightHandover 2026-11-12 lateHandover 2026-11-13 early
Ask about a machine, a procedure or a shift

The manual says nothing about an alarm after a die change, so the assistant says so and tags the line's planner. Her answer is saved, and the next person gets it with its source.

#maintenance
chat.example.com/ferrow/maintenance
maintenance
LB
Lukas Brandt14:05

@Plant assistant press 3 shows E-31 after the die change and won't start. Light curtain looks fine.

3 replies in thread
Plant assistantBot14:05

The PR-630 manuals and the handover notes don't cover E-31 after a die change, so I won't guess. @Katrin Meier you plan press 3, can you help?

Searched plant2.manuals and plant2.handover, no matching passage

KM
Katrin Meier14:11

@Plant assistant note for press 3: after a die change, E-31 only clears once the light curtain is reset at control panel B. Then restart the cycle.

Plant assistantBot14:11

Saved to plant2.fixes with Katrin as the source. The next question about E-31 gets this answer.

Message #maintenance

A new colleague emails the safety desk about cleaning the paint booth. The reply lists equipment and steps from the current revision, with section and date.

Inbox
mail.ferrow.example.com/inbox
milan.horvat@ferrow.example.com
Compose
Inbox3
Starred
Sent
Archive
Re: Cleaning the paint booth
Sd
Safety desk <safety@ferrow.example.com>09:41
to Milan Horvat

Hi Milan,

before you clean paint booth 2, the current safety instruction asks for these steps:

  • Switch booth 2 off at the control cabinet and let the extraction run on for 5 minutes before you enter.
  • Wear a respirator with an A2/P3 filter, nitrile gloves and safety goggles.
  • Clean only with the solvent-free cleaner from the booth cabinet. Never blow off the filter mats with compressed air.

Source: SI-PL-07 Cleaning the paint booth, section 4, revision 5 of Nov 3, 2026

Stop searching shared drives for the right page.

Today an answer depends on who is on shift and which binder sits at the line. With the assistant, everyone asks the same documents and sees where each answer comes from.

Today
Your manuals, procedures and notes
With the assistant
Your manuals, procedures and notes
connic

Finding the right page

Today: Search the shared drive for the right PDF and scroll to the page, or walk over to the office

With the assistant: Ask in the chat and get the value with the manual and page it comes from

See what your team asks and where the documents fall short.

Every question is recorded with its answer, the passages found and the cost, so these numbers need no extra tracking.

  • Questions without an answer

    Runs without an answer are tagged, and a dashboard chart counts them per week, so you see which documents are missing.

  • Answers backed by a passage

    A judge checks a sample of answers, for example whether the value matches the cited passage, and tracks the average over time.

  • Questions per team and channel

    Dashboards filter by assistant and channel, so you see how many questions come from each site, chat and the portal.

  • Cost per answer

    Every run shows its cost, and dashboards chart each assistant's cost over time.

Answers you can check, from knowledge each team may see.

Every answer names its source, each assistant searches only the knowledge you allow, and the sources keep themselves current.

Every answer shows its passage
Each passage comes back with its document, the page for PDFs and a link to the original file. The assistant names them next to the answer.
Answers follow the current document
SharePoint and OneDrive, Confluence and Notion sync on a schedule, from every 15 minutes to weekly, and only changed files are processed again.
Each site and team sees its own knowledge
Knowledge is split by site and team, and each assistant searches only the parts you allow. In your portal, answers can follow each person's groups from your company sign-in.
Every question is on record
Each question is kept with the passages found, the answer and its cost for your plan's retention period.
Retrieval · Sources
production
SourceNamespaceScheduleLast sync
SharePoint · Plant 2 manualsplant2.manualsHourly10:00 · 2 updated
SharePoint · Shift handoverplant2.handoverEvery 15 minutes10:15 · 3 new
SharePoint · Plant 1 manualsplant1.manualsHourly10:00 · no changes
Confluence · SafetysafetyDaily06:00 · 1 updated
Run · plant2-assistant
SpanData
Slack mention#maintenancereceivedtorque for the jaw screws on the TL-400 chuck…
retrieval_queryplant23 passagesTL-400 service manual · p. 860.4s
AnswerSlack threadsentTighten the four M12 jaw screws crosswise…

What the assistant may search is a file your engineers review.

For your engineers: sources are connected once in the dashboard. Which knowledge the assistant searches, how it answers and where it may write is one YAML file in your code.

Sources are connected once
Under Retrieval › Sources, pick the SharePoint sites and folders, a namespace such as plant2.manuals and a schedule. After the first sync, only changed files are downloaded.
Search and write rights in one block
The assistant may search plant2 and safety and store notes only in plant2.fixes. Any other search or write is denied, also when your own tools call it.
Checked on every deploy
Deploys check the rules and fail with the file and the rule that is wrong, before anything goes live.
agents/plant2-assistant.yaml
version: "1.0"
name: plant2-assistant
description: "Answers shop-floor questions for Plant 2"
model: connic/claude-sonnet-5.5
system_prompt: |
  You answer technicians and shift leads at Plant 2.
  Search plant2 and safety with retrieval_query first.
  Name the document and page for every value you give.
  If no passage answers the question, say so and name
  the planner for that line. Don't guess.
tools:
  - retrieval_query
  - retrieval_store
access:
  retrieval:
    plant2:
      search: true
    plant2.fixes:
      search: true
      store: true
    safety:
      search: true

Frequently Asked Questions

Synced sources such as SharePoint and OneDrive, Confluence Cloud, Notion, Zendesk Help Center and websites, and uploaded files: PDFs including scans, Word and OpenDocument files, spreadsheets, presentations, emails and images, up to 100 MiB per file. Password-protected files aren't supported. The assistant can also store notes your experts write in the chat.

As current as the last sync. Connected sources sync every 15 minutes up to weekly, websites every 12 hours up to weekly, and Sync now starts a run right away. Only changed content is processed again, and you choose whether content deleted at the source leaves the index.

You decide in the assistant's instructions. Usually it says the documents don't cover the question and names the person responsible, and a minimum match score keeps it from answering from a loosely related passage. An expert's answer can be stored for the next person who asks.

Knowledge is split into areas, for example one per site or team, and each assistant searches only the areas you list. Everyone in a chat channel gets the same answers, so restricted knowledge belongs in a portal with your company sign-in, where answers follow each person's groups. Portals are part of the developer, pro and enterprise plans.

Documents, the search index and every run stay in your project's EU region. connic/* models run in the EU, and managed inference isn't used to train models. You can also use your own provider keys. Your contract is with connic GmbH, a German company.

Start for free: connect one source, link the assistant to one chat and ask it your team's questions. If you'd rather have connic's own team build it with you, connic solutions starts with 1 to 2 weeks of scoping and a 4 to 6 week pilot. Usage is billed from Project credit, and unchanged content isn't charged again. Plans are on the pricing page.